The plumber is coming on Monday to fit the rest of the bathroom, so I need to get the tiles done. I've made a start, and more is done than in the picture. The goal is to finish it tomorrow.
The first fix for the electrics is all done and some of the second fix is in. The consumer unit is quite large! I think we have something like 13 circuits in total.
As you can see it looks a bit like spaghetti at the moment but again I think we should be well on the way by the end of next week.
The study is ready for painting just as soon as the plaster dries out. we've got the paint and brushes at the ready!
So, all in all I think we can say that we are definitely getting there. I've run the coax into one corner of the bedroom and want to run a second one to the other side so that we can chose which way round the bed goes and decide if we want the small TV in there or not.
I also need to chase some boxes into the walls in various rooms for the data network and TV distribution system.
No comments:
Post a Comment